Veterans Development Corporation (VDC) completed a major fuel infrastructure improvement project at the Manchester VA Medical Center in Manchester, New Hampshire. The project involved replacing aboveground fuel storage tanks, underground distribution piping, fuel dispensing equipment, and associated control systems serving the facility’s boiler plant.

With a project value exceeding $2.5 million, the work required careful planning and construction coordination. In addition, VDC managed environmental excavation and implemented a construction strategy that maintained uninterrupted boiler plant operations.

The project was among the infrastructure improvements identified in an August 2025 Department of Veterans Affairs announcement. The completed installation provides the medical center with modernized fuel storage infrastructure, improved monitoring capabilities, and an upgraded fuel distribution system.

Project Overview

  • Project: Aboveground Fuel Storage Tank Replacement
  • Client: Manchester VA Medical Center
  • Location: Manchester, New Hampshire
  • Contractor: Veterans Development Corporation, Inc.
  • Project Value: Over $2.5 Million
  • Start Date: August 30, 2025
  • Completion Date: August 27, 2026
  • Project Type: Federal Construction, Fuel Storage Infrastructure, Mechanical Systems Modernization

The project’s federal contract award is documented in the USAspending.gov contract record, which identifies VDC as the contractor for the Manchester VA aboveground storage tank replacement.

Modernizing Critical Fuel Storage Infrastructure

Reliable fuel storage and distribution systems are essential to institutional boiler plant operations. Aging equipment and underground piping can create maintenance challenges, environmental concerns, and operational risks.

At the Manchester VA Medical Center, VDC replaced existing aboveground fuel storage tanks and associated equipment supporting the boiler plant.

However, the project extended well beyond tank replacement. It also included substantial improvements to underground piping, fuel dispensing equipment, and system controls.

Together, these upgrades modernized the facility’s fuel infrastructure while addressing several interconnected mechanical and operational requirements.

Comprehensive Fuel Tank Replacement and Piping Installation

The project required removing outdated infrastructure and installing new equipment within an active medical center. As a result, construction sequencing and coordination were essential throughout the work.

Major Project Components

The scope included:

  • Removal and replacement of existing aboveground fuel storage tanks.
  • Removal of outdated fuel dispensing equipment.
  • Replacement of direct-buried underground fuel distribution piping.
  • Installation of new fuel storage and distribution components.
  • Replacement of associated fuel control equipment and systems.
  • Integration of a modern fuel management system with the facility’s Building Management System (BMS).
  • Testing, inspection, and commissioning of the replacement fuel system.
  • Controlled Vehicle Access: Motorized vehicle gate with Key card entry and video intercom screening to restrict unauthorized entry.

Each component contributed to the overall modernization of the boiler plant’s fuel infrastructure.

Furthermore, the combination of aboveground equipment installation, underground utility work, and control system integration required careful construction coordination.

Environmental Management and Contaminated Soil Removal

Environmental management was another important component of the Manchester VA project.

During construction, contaminated soil was identified in the existing fuel dispenser area. Consequently, the affected material required excavation before the replacement infrastructure could be installed.

Excavation, Testing, and Proper Disposal

VDC excavated the contaminated soil down to bedrock. Following excavation, a third-party laboratory independently tested the material.

The contaminated soil was then transported off-site for disposal in accordance with applicable environmental regulations and waste manifest requirements.

This work required coordination between excavation activities, laboratory testing, transportation, and disposal procedures.

Environmental considerations are an important part of fuel storage infrastructure management. The U.S. Environmental Protection Agency’s guidance on aboveground storage tanks provides additional information about applicable spill-prevention considerations and regulatory requirements.

By incorporating environmental management into the overall construction process, VDC addressed the affected area while advancing the fuel infrastructure replacement.

Maintaining Uninterrupted Boiler Plant Operations

One of the project’s most significant challenges was replacing the existing fuel system without disrupting the medical center’s boiler plant operations.

The importance of continuous operation is highlighted in a Department of Veterans Affairs article about the Manchester VA boiler plant. The article describes the facility’s around-the-clock boiler operations and their role in providing heating and hot water throughout the medical center.

Parallel Installation and Construction Sequencing

To address this challenge, VDC installed the replacement tanks, fuel distribution piping, and associated equipment alongside the existing active system.

This parallel installation approach allowed the original infrastructure to remain operational during construction.

As a result, the medical center continued using its existing fuel system while the replacement equipment was installed and prepared for service.

The approach required coordination of construction activities, equipment installation, testing, and the eventual transition to the new system.

Most importantly, VDC maintained uninterrupted boiler plant operations throughout the project.

Testing, Inspection, and Commissioning

Before placing the replacement system into service, the new infrastructure underwent testing and inspection.

Following successful testing, inspection, and approval by the State of New Hampshire, the replacement fuel system was commissioned.

This carefully coordinated transition allowed the facility to begin operating the new system without interrupting its boiler plant operations.

The successful installation demonstrates VDC’s ability to perform substantial mechanical infrastructure improvements at active healthcare facilities.

Fuel Management and Building Automation Integration

Beyond replacing the physical tanks and piping, VDC installed a modern fuel management system.

The new system was integrated with the medical center’s existing Building Management System (BMS).

Improved Monitoring and Operational Control

The integration provides enhanced capabilities for monitoring and managing the facility’s fuel infrastructure.

Key improvements include:

  • Enhanced fuel system monitoring.
  • Improved operational control.
  • Integration with existing building management infrastructure.
  • Modernized fuel management capabilities.
  • Security Enhancements:  Controlled Vehicle Access: Motorized vehicle gate with Key card entry and video intercom screening to restrict unauthorized entry.

These improvements extend the project’s benefits beyond equipment replacement. Additionally, the integration connects the fuel infrastructure with the facility’s broader building management systems.

Project Completion and Results

Veterans Development Corporation completed the Manchester VA Medical Center fuel storage tank replacement project on August 27, 2026.

The completed work addressed mechanical infrastructure, underground utility replacement, environmental management, and fuel system modernization.

Key Project Accomplishments

The project delivered several important outcomes:

  • Modernized Fuel Infrastructure: Replaced existing storage tanks, underground distribution piping, and associated equipment.
  • Environmental Management: Excavated contaminated soil, coordinated independent laboratory testing, and completed proper off-site disposal.
  • Operational Continuity: Installed the replacement system in parallel with existing infrastructure, maintaining uninterrupted boiler plant operations.
  • Upgraded Controls: Integrated a modern fuel management system with the existing Building Management System.
  • Successful Commissioning: Completed testing, inspection, state approval, and commissioning of the new fuel system.
  • Security Enhancements: Controlled Vehicle Access: Motorized vehicle gate with Key card entry and video intercom screening to restrict unauthorized entry.

Collectively, these accomplishments demonstrate VDC’s ability to manage complex construction projects involving mechanical systems, environmental responsibilities, and operationally sensitive facilities.

Experienced Federal Construction and Mechanical Infrastructure Contractor

Veterans Development Corporation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) providing general contracting, mechanical services, and construction solutions for federal and institutional clients.

The Manchester VA Medical Center project highlights VDC’s experience with critical infrastructure upgrades at active government healthcare facilities.

From underground utility replacement to mechanical equipment installation and building system integration, VDC coordinates the specialized work required for complex construction projects.

Explore VDC’s general contracting and construction and mechanical services to learn more about the company’s experience delivering infrastructure improvements for government and institutional facilities.