Procore
Procore
Procore
7F050676-20D4-4F13-82C4-458A568F35F7
8AF802DF-0D82-4E62-BDEE-71884E3C7A58
243A4AF4-348D-4F9A-A10B-5C2D1880E37B
Procore
Procore
961E5499-E74B-4501-8D22-22BBD5029BCE
Procore
1895250E-90E1-4CEE-B0F1-C4BD72367739
3756933B-617D-4E56-B34C-584D7E90F00C
Procore
A3AE0605-45A3-41E6-867C-859AF4C81EBE
Procore
Procore
Procore
Procore
Procore
Procore
E7D00585-856D-40D0-812F-7613E85BF994
Procore
Procore
Procore
FD6DF937-7175-4ABB-AD0B-21052961BEB6
FEF0571E-DD43-4309-8EAB-E07B165B2B8E
previous arrow
next arrow
Procore
Procore
Procore
7F050676-20D4-4F13-82C4-458A568F35F7
8AF802DF-0D82-4E62-BDEE-71884E3C7A58
243A4AF4-348D-4F9A-A10B-5C2D1880E37B
Procore
Procore
961E5499-E74B-4501-8D22-22BBD5029BCE
Procore
1895250E-90E1-4CEE-B0F1-C4BD72367739
3756933B-617D-4E56-B34C-584D7E90F00C
Procore
A3AE0605-45A3-41E6-867C-859AF4C81EBE
Procore
Procore
Procore
Procore
Procore
Procore
E7D00585-856D-40D0-812F-7613E85BF994
Procore
Procore
Procore
FD6DF937-7175-4ABB-AD0B-21052961BEB6
FEF0571E-DD43-4309-8EAB-E07B165B2B8E
previous arrow
next arrow

The project consists of removing and replacing a large diameter cooling water pipe within the existing 9 story shaft.  The construction work involved heavy rigging and staging. The project required the removal and replacement of the cooling water piping system to the high horsepower pumps. The project consists of removing the existing chiller from the roof top and installing temporary chiller lines for a temporary chiller.  Construction will be finalized with further installation and final piping for the new chiller.

The project is currently ongoing and is expected to be completed in September 2022.